NPTEL Wastewater Treatment And Recycling Week 5 Assignment Answer 2023

NPTEL Wastewater Treatment And Recycling Week 5 Assignment Solutions

NPTEL Wastewater Treatment And Recycling Week 5 Assignment Answer 2023

1.

NPTEL Wastewater Treatment And Recycling Week 5 Assignment Answer 2023
Answer :- For Answer Click Here

2. Which of the given treatment stages is NOT included in the preliminary treatment of wastewater:
a. Oil and greases are removed by skimming tanks
b. Suspended matters are removed by sedimentation tank
c. Floating materials are removed by screening
d. Grit and sand are removed by grit chambers

Answer :- For Answer Click Here

3. Which of these units has a detention period of the order of 1 min:
a. Grit Chamber
b. Primary Sedimentation
c. Secondary Sedimentation
d. Aeration Tank

Answer :- For Answer Click Here

4. Which of the following could be an appropriate velocity through the screens?
a. 0.08 m/s
b. 0.8 m/s
c. 8 m/s
d. 80 m/s

Answer :- For Answer Click Here

5. The equalization tank is used to:
a. Eliminate variation in flow-rate
b. Improve performance of downstream processes
c. Balance fluctuating concentrations in the influent
d. All of the above

Answer :- For Answer Click Here

6.

NPTEL Wastewater Treatment And Recycling Week 5 Assignment Answer 2023
Answer :- For Answer Click Here

7. Settling velocity under flocculent settling 15:
a. Same as under discrete settling
b. Lower than the discrete settling
c. Higher than the discrete settling
d. Could be lower or higher than the discrete settling

Answer :- For Answer Click Here

8. The zone located at the bottom of a rectangular sedimentation basin 15:
a. Inlet Zone
b. Outlet Zone
c. Settling Zone
d. Sludge Zone

Answer :- For Answer Click Here

9. The tube and plate settlers compared with conventional sedimentation tank, generally require
a. Lesser area but higher input energy
b. More area but lower input energy
c. More area and higher input energy
d. Lesser area and lower input energy

Answer :- For Answer Click Here

10.

NPTEL Wastewater Treatment And Recycling Week 5 Assignment Answer 2023
Answer :- For Answer Click Here

11. Surface loading rate of a settling basin is 18 m’ hr/m?. Approximately, what percent of the particles that have a settling velocity of 0.006 m/sec will be removed?
a. 40 %
b. 60 %
c. 80 %
d. 100 %

Answer :- For Answer Click Here

12. The terminal settling velocity of a 0.01 mm diameter spherical particle with specific gravity 2.65, in water of density 998.2 kg/m and dynamic viscosity 1.002 × 10-3 Ns/m?, would be:
a. 90 cm/s
b. 9 cm/s
c. 0.09 cm/s
d. 0.009 cm/s

Answer :- For Answer Click Here

13. A circular primary clarifier is to be designed at an overflow rate of 40 m/day to treat 500C m/day of wastewater flow. The approximate diameter of the tank should be:
a. 12.6 m
b. 20 m
c. 28.2 m
d. 36.5 m

Answer :- For Answer Click Here

14. The headloss through a bar rack with an approach velocity of 0.70 m/s and velocity through the screen of 1.05 m/s, will be:
a. 30 mm
b. 45 mm
c. 60 mm
d. 75 mm

Answer :- For Answer Click Here

15. A grit chamber, with a detention time of 40 seconds is treating a wastewater flow of 8,000 m3day, with a flow-through velocity of 0.3 m/s. The length of the grit chamber would be:
a. 7.2 m
b. 10 m
c. 12 m
d. 18.6 m

Answer :-  For Answer Click Here
Course NameWastewater Treatment And Recycling
CategoryNPTEL Assignment Answer
HomeClick Here
Join Us on TelegramClick Here