Q1. Hillier model is used for:
(A) Discontinuous probabilistic events
(B) Continuous probabilistic events
(C) Both continuous and discontinuous probabilistic events
(D) None of these
Ans:- (C) Both continuous and discontinuous probabilistic events
Q2. PRAM is used
(A) To calculate the overall risk factor
(B) To calculate the profit of project
(C) To analyze and address risk
(D) None of these
Ans:- (C) To analyze and address risk
Q3. How many phases are involved in project risk management process following the PRAM methodology?
(A) Five
(B) Six
(C) Nine
(D) Ten
Ans:- (C) Nine
Q4. Which of the following technique is not used for the analysis of standalone risk?
(A) Sensitivity analysis
(B) Simulation analysis
(C) Market risk analysis
(D) Hillier Model
Ans:- (C) Market risk analysis
Q5. The limitation of the sensitivity analysis is
(A) No variable is considered
(B) Only one variable is considered
(C) Only two variables are considered
(D) None of these
Ans:- (B) Only one variable is considered
Q6. Which of the following technique is used for the analysis of contextual risk?
(A) Hillier model
(B) Break-even analysis
(C) Corporate risk analysis
(D) Decision tree analysis
Ans:- (A) Hillier model
Q7. The net probability of failure(Pf) is 0.48 and consequences of failure(Cf) is 0.50. Calculate the risk factor (RF)?
(A) 0.98
(B) 0.02
(C) 0.74
(D) 0.64
Ans:- (C) 0.74
Q8. The net sum of cash inflows is 200 and net sum of cash outflows is 160. Calculate probability index (PI) and Net present value (NPV) respectively?
(A) PI = 0.80 and NPV = 40
(B) PI = 1.25 and NPV = 360
(C) PI = 1.25 and NPV = 40
(D) PI = 0.80 and NPV = 360
Ans:- (C) PI = 1.25 and NPV = 40
Q9. The formula used to calculate the overall risk factor (RF) is
(A) Pf + Cf – (Pf) * (Cf)
(B) Pf – Cf – (Pf) * (Cf)
(C) Pf + Cf – (Pf) / (Cf)
(D) Pf – Cf – (Pf) / (Cf)
Ans:- (A) Pf + Cf – (Pf) * (Cf)
Q10. Standalone risk techniques are used for the analysis of
(A) Upcoming project
(B) Finished project
(C) Project at hand only
(D) Profitable project
Ans:- (A) Upcoming project